The difference lives inside the build.

ASSEMBLY LIBRARY / REV 01

This is the framework we use to ask better questions, define a complete scope, and coordinate the systems hidden behind the finished work.

Important distinction

Technical guide, not a project drawing.

These standards explain how we think. They do not replace site measurements, engineering, manufacturer instructions, approved plans, permits, code review, or the signed project scope. Final requirements change with the house, climate, jurisdiction, selections, and conditions found in the field.

The control layers

Every layer has one clear job.

Durable work keeps the structure, water, air, heat, and finish layers continuous through corners, openings, and changes in material.

Simplified enclosure sequence

Site, foundation & support

Carry the project safely into suitable bearing while managing grade, frost, water, and access.

ASM-01

Verify in design and field

  • Existing grade, drainage paths, utilities, and work access
  • Footing, pier, slab, crawlspace, or deck-based support strategy
  • Local frost depth, soil and project-specific design requirements
  • Post bases, anchors, concrete clearances, and moisture separation
  • Stair and landing relationships to final grade

Field note

Foundation type and dimensions are project-specific and must follow the approved design, engineering where required, and local code.

Primary structure & load path

Move roof, floor, wind, snow, occupancy, and lateral loads through every framing member and connection.

ASM-02

Verify in design and field

  • Joist, beam, header, rafter, post, and ledger sizing
  • Bearing points and load transfer into the existing home
  • Fastener, hanger, strap, anchor, and connector selection
  • Roof pitch, span, overhang, uplift, and lateral stability
  • Openings, point loads, and changes in framing direction

Field note

Member sizing is not selected by appearance. Spans, species, grade, loading, support, and connection details all affect the answer.

Roofing, flashing & drainage

Keep bulk water moving outward and downward through durable, layered paths with no single point of dependence.

ASM-03

Verify in design and field

  • Roof-to-wall flashing and counterflashing
  • Valleys, step flashing, kick-outs, eaves, and penetrations
  • Window and door sill pans, jamb flashing, and head flashing
  • Water-resistive barrier laps and drainage-plane continuity
  • Gutters, downspouts, splash control, grade, and discharge location

Field note

Sealant is a maintenance joint, not a substitute for layered flashing or gravity-directed drainage.

Insulation, air sealing & comfort

Match the enclosure and mechanical system to the room’s intended use, glass area, orientation, and local climate.

ASM-04

Verify in design and field

  • Floor, wall, roof, rim, and transition insulation strategy
  • Air-sealing continuity at openings and house connections
  • Low-E selection, argon fill, safety glass, and solar exposure
  • Heating and cooling load, zoning, controls, and condensate
  • Ventilation, ceiling fans, shading, and overheating control

Field note

A true all-season room needs a complete thermal and air-control layer plus properly planned conditioning—not just insulated walls.

Windows, doors & wall systems

Select openings for use, ventilation, safety, energy performance, water control, and the proportions of the room.

ASM-05

Verify in design and field

  • Rough-opening support, square, level, shimming, and anchoring
  • Operation, egress, safety-glazing, screen, and hardware needs
  • Double-pane Low-E argon glass for conditioned-room applications
  • Multi-track vinyl panel and screen systems for seasonal rooms
  • Sill height, transom alignment, trim depth, and view lines

Field note

Simonton 5500 windows are a common all-season option; final product and glazing specifications are confirmed for each project.

Electrical, lighting & equipment

Coordinate outlets, switching, lighting, fans, media, heating and cooling, and exterior loads before walls close.

ASM-06

Verify in design and field

  • Circuit availability, panel capacity, and dedicated-load needs
  • Outlet layout, exterior protection, and code spacing
  • Lighting layers, ceiling fans, controls, and fixture support
  • Mini-split power, disconnect, line-set path, and condensate
  • TV, data, low-voltage, floodlight, and future-use preparation

Field note

Electrical and mechanical work must be completed and permitted by properly qualified trades where required.

Exterior & interior finish

Protect the assembly and make new work look intentional at every visible transition.

ASM-07

Verify in design and field

  • PVC, composite, treated wood, siding, soffit, and trim exposure
  • Band boards, risers, fascia, skirt, column, and beam wrapping
  • Tongue-and-groove pine, shiplap, wallboard, and finish choices
  • Expansion, ventilation, drainage, fasteners, and finish maintenance
  • Color, profile, reveal, joint, and existing-material alignment

Field note

Materials are selected around exposure, movement, maintenance, appearance, and the approved scope—not by color alone.

Room-system comparison

Screen, three-season, and all-season are different assemblies.

DecisionScreen roomThree-seasonAll-season
Intended useOpen-air insect protectionSpring-through-fall extensionConditioned year-round living
Opening systemFiberglass or specified screenMulti-track vinyl panels + screensInsulated double-pane Low-E glass
Thermal envelopeNot a conditioned envelopeVaries; not designed as living spaceContinuous insulation and air sealing
Heating & coolingFans or outdoor comfort optionsNot designed for permanent conditioningDesigned and sized as part of the room
Foundation / floorProject-specific porch or deck structureProject-specific support and floorCode-compliant conditioned-room assembly

Climate

Wind, snow, humidity, solar gain, and exposure

Water

Every lap and transition drains in the right direction

Comfort

Room use and glass area drive the conditioning plan

Experience

Switching, lighting, view lines, and furniture are planned early